Miami-Dade County Ordinance 22-83 effective January 1, 2023 prohibits conventional Type 1 septic systems for new installations, requiring Type 2, Type 3, or Type 4 systems instead (Miami-Dade County). New septic system installation in Miami-Dade typically costs $8,000-$25,000 depending on system type, size, site conditions, and installation complexity.
Installation process requires site evaluation, soil testing, permit approval from DERM, professional design, licensed contractor installation, and final inspection before use (Florida DOH). New systems must maintain minimum 100 feet from surface water bodies, 50 feet from property lines, and drainfield bottom must be 36 inches above wet season high water table.
Professional installation by licensed contractors ensures compliance with Miami-Dade County requirements and protects groundwater in sensitive environmental conditions (EPA). All new installations require prior written approval from Miami-Dade DERM Director (Miami-Dade Permits), comprehensive documentation, and proper system design for site conditions.
How much does Septic System Installation cost in Miami?
Average Septic System Installation Cost in Miami
Minimum Cost
$6,000
Small Type 2 system, simple site
Average Cost
$15,000
Standard Type 3 system
Maximum Cost
$35,000
Large Type 4 system, complex site
Typical Range: $8,000-$25,000 for most new septic system installations in Miami-Dade County
New septic system installation costs vary significantly based on system type, size, site conditions, and installation complexity. Most Miami-Dade homeowners spend $8,000-$25,000 for professional installation including permits, site evaluation, and system components (EPA).
Factors affecting costs:System type: Type 2 systems cost $8,000-$15,000 for residential installations. Type 3 systems cost $12,000-$20,000 with advanced treatment. Type 4 systems cost $15,000-$30,000 with nutrient reduction. More advanced systems cost more but provide better environmental protection.
System size: Small residential systems (1,000-1,500 gallons) cost $8,000-$15,000. Standard systems (1,500-2,000 gallons) cost $12,000-$20,000. Large systems (2,000+ gallons) cost $18,000-$30,000. Commercial systems cost $20,000-$50,000 or more depending on size.
Site conditions: Easy sites with good soil and drainage cost standard rates. Difficult sites requiring special design cost $2,000-$5,000 more. High water table sites require elevated drainfields adding $3,000-$8,000. Rocky or difficult excavation adds $2,000-$6,000.
Permits and approvals: Site evaluation and soil testing cost $500-$1,500. Permit fees cost $500-$2,000 depending on system type. Engineering design costs $1,000-$3,000 for complex sites. Professional permits and approvals are essential and included in installation costs.
Installation complexity: Standard installation costs base rates. Complex installations with multiple tanks or advanced treatment cost $3,000-$10,000 more. Pump systems for elevation differences add $2,000-$5,000. Specialized equipment or techniques add to costs.
What's typically included:- Site evaluation and soil testing
- System design and engineering
- Permit applications and approvals
- Tank and system components
- Professional excavation and installation
- Drainfield construction
- Final inspection and approval
- System registration with DERM
Installation costs are significant investments, but proper installation ensures system function, environmental protection, and compliance with Miami-Dade County requirements. Professional contractors provide comprehensive installation services.
Need help today?
Same-day service across Miami-Dade. Licensed & insured.
Call Miami Septic ProsInstallation process step-by-step
New septic system installation follows structured process ensuring compliance and proper function:
Step 1: Site evaluation and soil testingLicensed professional conducts comprehensive site evaluation including soil percolation testing to measure how quickly water flows through native soil, soil composition analysis to identify soil type and properties, property boundary assessment to verify setback compliance, water well identification to ensure minimum separation distances, surface water mapping to identify proximity to water bodies, topographic analysis to evaluate elevation and drainage, and environmental sensitivity evaluation. Site evaluation determines appropriate system type and design.
Step 2: System design and planningBased on site evaluation results, professional engineer or qualified designer creates system design meeting Miami-Dade County requirements. Design includes tank size and type selection, drainfield sizing and layout, treatment system specifications, elevation and setback compliance, and construction specifications. Design must meet Type 2, Type 3, or Type 4 requirements depending on site conditions.
Step 3: Permit applicationSubmit required documentation to Miami-Dade DERM including site plan showing property boundaries and system location, building plan showing proposed construction, site evaluation results including soil testing data, system design specifications, and permit application forms. Prior written approval from DERM Director is required before installation can begin.
Step 4: Permit approvalDERM reviews application for compliance with regulations, verifies setback requirements, evaluates system design appropriateness, and issues approval or requests modifications. Review process typically takes several weeks to months depending on application completeness and complexity.
Step 5: Professional installationLicensed contractor performs installation including excavation for tank and drainfield, tank placement and leveling, drainfield construction and pipe installation, backfilling and soil compaction, and connection to building plumbing. Installation must follow approved design specifications exactly.
Step 6: Inspection and approvalAfter installation completion, state inspector conducts final inspection to verify compliance with approved design, check proper installation practices, ensure setback requirements are met, and approve system for use. System must pass inspection before use.
Step 7: System registrationRegister completed system with DERM as required by county ordinance. Registration provides system documentation for future reference and compliance tracking.
Following proper installation process ensures system function, environmental protection, and regulatory compliance. Professional contractors manage entire process efficiently.
Permits and approvals needed
New septic system installation requires several permits and approvals (Miami-Dade County):
DERM approval:- Prior written approval from Miami-Dade DERM Director required
- Application review for compliance with Ordinance 22-83
- System type and design approval
- Setback and elevation requirement verification
- Site plan showing property boundaries and system location
- Building plan showing proposed construction
- Site evaluation results including soil testing data
- System design specifications and engineering drawings
- Permit application forms with required information
- Site evaluation and testing: $500-$1,500
- DERM permit application: $500-$2,000
- Engineering design review: $500-$1,500
- Inspection fees: $300-$800
- Total permit costs: $1,800-$5,800 typically
Permit approval process typically takes 4-12 weeks from application submission to approval, depending on application completeness, site complexity, DERM review workload, and whether modifications are needed. Incomplete applications cause delays.
Professional assistance:Professional contractors handle permit applications and coordinate with DERM. Contractors understand requirements and ensure applications are complete, reducing delays. Working with experienced contractors streamlines permit process significantly.
Obtaining proper permits and approvals before installation ensures compliance and prevents costly problems (Florida DOH). Professional contractors manage permit process efficiently.
System type requirements
Miami-Dade County requires specific system types for new installations (Miami-Dade County):
Type 2 systems:- Meet secondary treatment standards
- Suitable for single-family homes or duplexes
- Generate less than 500 gallons per day
- Located at least 1,000 feet from surface water bodies
- Cost $8,000-$15,000 typically
- Meet advanced secondary treatment standards
- For multifamily residences and other uses
- Generate up to 1,000 gallons per day
- Located at least 1,000 feet from surface water bodies
- Cost $12,000-$20,000 typically
- Meet Florida Keys Nutrient Reduction Treatment Standards
- Required when Type 2 or Type 3 criteria not met
- Provide enhanced nutrient reduction
- For sensitive environmental areas
- Cost $15,000-$30,000 typically
Conventional Type 1 systems are prohibited for new installations effective January 1, 2023. Only Type 2, Type 3, or Type 4 systems are allowed for new installations or complete replacements. Existing Type 1 systems can continue operating but must meet maintenance requirements.
System selection:System type selection depends on property usage, wastewater volume, proximity to surface water, environmental sensitivity, and site conditions. Professional contractors and engineers evaluate site conditions and recommend appropriate system type meeting requirements.
Selecting appropriate system type ensures compliance with Miami-Dade County regulations and environmental protection (Miami-Dade County). Professional evaluation determines correct system for each property.
Site evaluation and testing
Comprehensive site evaluation is mandatory before installation:
Soil percolation testing:- Measures how quickly water flows through native soil
- Determines drainfield sizing requirements
- Identifies soil suitability for septic systems
- Conducted by licensed professionals
- Identifies soil type and properties
- Evaluates treatment capacity
- Determines drainage characteristics
- Affects system design requirements
- Verifies property boundaries
- Ensures setback compliance
- Identifies available installation area
- Maps system location requirements
- Identifies proximity to surface water bodies
- Evaluates environmental sensitivity
- Assesses groundwater protection needs
- Determines system type requirements
- Measures high water table elevation
- Determines drainfield elevation requirements
- Ensures 36-inch minimum above water table
- Affects system design and cost
Site evaluations must be conducted by licensed engineers or qualified professionals. Professional evaluation ensures accuracy and compliance with regulations. Site evaluation results determine system design and type requirements.
Comprehensive site evaluation identifies site-specific conditions affecting installation. Professional evaluation ensures appropriate system design for each property's unique conditions.
Setback and design requirements
New septic systems must meet specific setback and design requirements:
Setback distances:- Minimum 100 feet from any surface water body
- Minimum 50 feet from property lines (where public water unavailable)
- Required distances protect water quality
- Non-compliance prevents installation
- Drainfield bottom must be 36 inches above wet season high water table
- Prevents groundwater contamination
- Affects system design and cost
- Elevated drainfields may be required
- Systems cannot be under buildings
- Five feet minimum from mobile home walls
- Five feet minimum from building foundations
- 75 feet from annual flood lines of surface water
- Must meet treatment standards for system type
- Proper tank sizing for property usage
- Adequate drainfield sizing for soil conditions
- Compliance with all Miami-Dade regulations
Meeting setback and design requirements ensures environmental protection and regulatory compliance (Florida DOH). Professional contractors understand requirements and ensure installations meet all standards.
Installation timeline
New septic system installation typically takes 2-6 months from start to completion:
Site evaluation: 1-2 weeksInitial site evaluation and soil testing typically takes 1-2 weeks. Scheduling evaluation, conducting tests, and receiving results requires time. Professional contractors coordinate evaluation efficiently.
System design: 2-4 weeksSystem design based on evaluation results takes 2-4 weeks. Engineering design, specification preparation, and design review require professional time. Complex sites may take longer.
Permit application: 2-4 weeksPreparing and submitting permit applications takes 2-4 weeks. Document preparation, application completion, and submission coordination require time. Complete applications process faster.
Permit approval: 4-12 weeksDERM review and approval takes 4-12 weeks typically. Review time depends on application completeness, site complexity, and DERM workload. Complete applications with all required documentation process faster than incomplete applications.
Installation: 1-2 weeksPhysical installation takes 1-2 weeks after permit approval. Excavation, tank placement, drainfield construction, and connections require time. Weather and site conditions affect installation duration.
Inspection and approval: 1-2 weeksFinal inspection and approval takes 1-2 weeks. Inspection scheduling, inspection completion, and final approval require time. System must pass inspection before use.
Total timeline: 2-6 monthsComplete installation process typically takes 2-6 months from initial site evaluation through final approval. Timeline varies based on application completeness, site complexity, permit review time, and installation conditions. Professional contractors manage timeline efficiently.
Understanding timeline helps property owners plan appropriately. Professional contractors coordinate all phases to minimize delays and complete installations efficiently.
Frequently Asked Questions
How much does septic system installation cost?
New septic system installation in Miami-Dade typically costs $8,000-$25,000 depending on system type, size, site conditions, and installation complexity. Type 2 systems cost $8,000-$15,000. Type 3 systems cost $12,000-$20,000. Type 4 systems cost $15,000-$30,000. Site conditions, system size, permits, and installation complexity all affect costs. Professional contractors provide detailed estimates based on specific property needs.
How long does it take to install a septic system?
Installation timeline typically takes 2-6 months from initial site evaluation through final approval. Site evaluation takes 1-2 weeks. System design takes 2-4 weeks. Permit application takes 2-4 weeks. Permit approval takes 4-12 weeks. Installation takes 1-2 weeks. Inspection and approval takes 1-2 weeks. Timeline varies based on application completeness, site complexity, and permit review time. Professional contractors coordinate all phases to minimize delays.
What permits do you need to install a septic system?
New installations require prior written approval from Miami-Dade DERM Director, site plan showing property and system location, building plan showing proposed construction, site evaluation results including soil testing, system design specifications, and permit application forms. Permit fees cost $1,800-$5,800 typically including evaluation, application, review, and inspection fees. Professional contractors handle permit applications and coordinate with DERM.
What type of septic system is required in Miami?
Miami-Dade County requires Type 2, Type 3, or Type 4 systems for new installations. Type 1 conventional systems are prohibited effective January 1, 2023. Type 2 systems are for single-family homes generating less than 500 gallons per day. Type 3 systems are for multifamily properties generating up to 1,000 gallons per day. Type 4 systems are required when Type 2 or Type 3 criteria aren't met. System type depends on property usage, wastewater volume, and site conditions.
How do you install a new septic system?
Installation process includes site evaluation and soil testing by licensed professional, system design meeting Miami-Dade requirements, permit application to DERM with required documentation, permit approval from DERM Director, professional installation by licensed contractor following approved design, final inspection by state inspector, and system registration with DERM. Professional contractors manage entire process ensuring compliance and proper installation.
What is the process for installing a septic system?
Process begins with site evaluation to assess soil conditions and site suitability. System design is created based on evaluation results meeting regulatory requirements. Permit application is submitted to DERM with all required documentation. Permit approval is obtained from DERM Director. Professional installation is performed by licensed contractor following approved design. Final inspection verifies compliance and approves system for use. System registration completes process. Each step requires professional expertise and compliance with regulations.
Can I install my own septic system?
Owner-occupied single-family homes may have exemptions from contractor registration, but all installations require permits, inspections, and compliance with regulations. Professional installation is strongly recommended because systems must meet strict requirements, proper installation ensures function and environmental protection, mistakes are expensive to fix, and professional contractors understand regulations and ensure compliance. DIY installation risks non-compliance and expensive corrections.