Septic System Design & Permits in Palmetto Bay, FL
A septic design in Palmetto Bay has to answer how high the wet-season water table reaches on your lot, because Miami-Dade requires the drain field...
Free Fast Quote
Please fill out this form to request a free quote on your septic project and our team will respond to you right away.
- Free, no-obligation quote
- We aim to respond quickly
- Serving all of Miami-Dade County
Septic design and permits in Palmetto Bay: the short answer
A septic design in Palmetto Bay has to answer how high the wet-season water table reaches on your lot, because Miami-Dade requires the drain field bottom to sit at least 36 inches above it. Close to the bay, that often means a raised or mound field, designed by a Florida professional engineer and approved by DERM.
In the County's 2018 study, 16% of Palmetto Bay's residential septic parcels already reached peak groundwater within 42 inches of the surface, and the projection for 2030 was 30%. The design has to work for the wet season the site will see over the system's life, not just the day of the soil test.

The Florida Department of Health in Miami-Dade issues the construction permit after a site evaluation; DERM approves new and whole replacement systems. We handle the soil evaluation, the engineered plans and both submissions, and we tell you early if the lot points to a mound.
What the numbers say about Palmetto Bay
- In the County's 2018 groundwater study, 893 of Palmetto Bay's 5,757 modelled residential septic parcels (16%) already reached peak groundwater within 42 inches of the surface; the projection for 2030 was 1,753. (Miami-Dade, 2018)
- The 2018 study also counted 53 non-residential septic parcels in Palmetto Bay, 5 of them at the 42-inch groundwater threshold. (Miami-Dade, 2018)
- The County asks residents of municipalities such as Palmetto Bay to check sewer status with their local water and sewer department. (Miami-Dade WASD)

How we handle design and permits in Palmetto Bay
- We confirm whether public sewer is available at the lot.
- We arrange the site evaluation the Department of Health requires.
- A Florida professional engineer prepares signed and sealed plans for DERM.
- We submit both applications and follow them through inspection.
State fees are $100 for a new system application and plan review and $115 for a site evaluation, plus County review and engineering. (Rule 62-6.030)
Septic design and permits in Palmetto Bay: questions
Do I need an engineer for a Palmetto Bay septic design?
For a new or whole replacement system, yes. Ordinance 22-83 requires engineering reports and plans signed and sealed by a Florida professional engineer for DERM approval.
What makes a Palmetto Bay site hard to design for?
High groundwater near the bay, the 100-foot setback from canals and lakes, and fitting a raised drain field and its reserved area around an existing house, pool and trees.
Sources
Last updated: October 28, 2026. Facts and figures on this page come from these sources, opened on October 28, 2026. Prices are typical published ranges, not a quote.
- Rule 62-6.030, F.A.C.: Fees, Florida Administrative Code, Florida Department of State (flrules.org). Opened 28 Oct 2026.
- Onsite Sewage FAQ: Permitting, Florida Department of Environmental Protection (last modified 24 Sep 2026). Opened 28 Oct 2026.
- Ordinance relating to Onsite Sewage Treatment and Disposal Systems (Ordinance 22-83, adopted 7 Jul 2022), Miami-Dade County Board of County Commissioners. Opened 28 Oct 2026.
- Resolution creating a Septic to Sewer Task Force, Agenda Item 11(A)(10), 8 July 2021 (Exhibit A, WASD charts), Miami-Dade County Board of County Commissioners. Opened 28 Oct 2026.
- Septic Systems Vulnerable to Sea Level Rise (final report, November 2018), Miami-Dade County RER, WASD and Florida Department of Health in Miami-Dade. Opened 28 Oct 2026.
- Palmetto Bay, FL: housing (ACS 2020-2024 5-year estimates), U.S. Census Bureau, American Community Survey (via Census Reporter). Opened 28 Oct 2026.
- Connect 2 Protect: Septic to Sewer, Miami-Dade Water and Sewer Department. Opened 28 Oct 2026.
